D within the allowable selection of temperature modifications, in order that the operation price of creating clusters in the entire period was minimized. The Streptonigrin Antibiotic Indoor temperature was set to lower constantly at 1 h and 174 h, which was mainly on account of the continuous lower of outside temperature throughout these periods. In the event the indoor temperature was to be maintained at a high level, the heating load will be elevated, then the heating price could be increased. The indoor temperature setting had a considerable upward trend at 82 h. Combined together with the progressively rising outside temperature, it could be observed that this appropriately increases the indoor temperature setting to store the heat load in advance. Over 126 h, the outdoor temperature adjustments tiny, whilst the indoor temperature setting decreases continuously, mainly since the HI supplied by the higher temperature set at 12 h may be made use of for heating throughout these periods. In Figure 10, the temperature of BU3 at 24 h was certainly higher than that of BU1 and BU2, which was mostly because each BU needed to ensure the identical temperature in the starting as well as the finish with the power management cycle, which was convenient for periodic management, and the phenomenon in Figure 11 was the exact same. Lastly, by comparing the outside temperature, indoor set temperature and indoor heat load, it may be concluded that, when the outdoor Sensors 2021, 21, x FOR PEER Critique 12 of 20 temperature was inside the declining stage, the indoor temperature setting steadily decreases plus the heat load decreases. When the outdoor temperature was in the rising stage, the indoor temperature setting progressively rises and the heat load increases. When the outside along with the heat load increases. When the outdoor temperature was in a steady stage, the outtemperature was in a stable stage, the outdoor temperature setting steadily decreased door temperature setting progressively decreased and also the heat load decreased. plus the heat load decreased.Figure 10. Indoor temperature management. Figure ten. Indoor temperature management.Sensors 2021, 21,12 ofFigure 10. Indoor temperature management.Figure 11. Heat load of building. Figure 11.The ASHP heat supply was shown in Figure 12. As can be noticed in Figure 12, the12, the The ASHP heat supply was shown in Figure 12. As could be noticed in Figure ASHP heating outputoutput of 3 buildings was basicallycapacity. The ASHP output curves ASHP heating of three buildings was essentially at full at complete capacity. The ASHP output tend to usually coincide with all the higher and low external ambient temperature dueIt may be curves coincide using the higher and low external ambient temperature resulting from COP. to COP. concluded that the heating price of ASHP was lowerwas lowerof the that from the heating netSensors 2021, 21, x FOR PEER REVIEWIt can be concluded that the heating cost of ASHP than that than heating network when 13 of 20 the outside temperature temperatureC andat 0 and clusters were preferentially heated operate when the outside was at 0 was the building the creating clusters were Combretastatin A-1 Biological Activity preferby ASHP. entially heated by ASHP.Figure 12. Heating power of GB. Figure 12. Heating power of GB.The GB output and the heating pipe network supply were shown in Figures 13 and 14. The GB output as well as the heating pipe network supply had been shown in Figures 13 and Firstly, the output degree of GB was consistent with the heat output degree of the heating 14. Firstly, the output level of GB was consistent using the heat output output on the electric network to.